PROGRESS UPDATE OF PHODONG VILLAGE IN JUNE 2021
Construction progress update of PhoDong Village model green urban area of the developer – Saigon Construction Corporation (SCC) – in June 2021.
With a total area of 41ha, low construction density of only 24.09%, PhoDong Village is proud to be a model green urban area project, scaled, planned and developed infrastructure synchronously.
Below are photos of the construction progress of zones B and E of PhoDong Village urban area up to the present time, in which:
♦ Zone B: Townhouses
From B1 to B13: under construction of the second-floor beam and slab reinforcement
From B21 to B33: under construction of the third-floor beam and slab reinforcement
♦ Zone E: Terraced House
From E1 to E6: under construction of the second-floor
From E22 to E30: under construction of the third-floor
Zones B and E of PhoDong Village urban area started construction from March 2021
Zone B – Townhouses – under construction of the floor beam and slab reinforcement
Zone B – Townhouses – under construction of the floor beam and slab reinforcement
Zone B – Townhouses – under construction of the floor beam and slab reinforcement
Zone B – Townhouses – under construction of the floor beam and slab reinforcement
Zone E – Terraced House – under construction of the second and third floor
For more information, please contact SCC – the developer – Sales Department:
♦ Hotline: 0926888777
♦ Tel: (84-28) 37425777
♦ www.phodongvillage.com